Skip to content

build(deps): bump github.com/tetratelabs/wazero from 1.10.1 to 1.11.0 #10670

build(deps): bump github.com/tetratelabs/wazero from 1.10.1 to 1.11.0

build(deps): bump github.com/tetratelabs/wazero from 1.10.1 to 1.11.0 #10670

Triggered via push December 30, 2025 15:01
Status Failure
Total duration 34m 46s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (1.24.x, windows-latest)
Process completed with exit code 1.
test (1.25.x, windows-latest)
The strategy configuration was canceled because "test._1_24_x_windows-latest" failed
test (1.25.x, windows-latest)
The operation was canceled.
test (1.25.x, ubuntu-latest)
The strategy configuration was canceled because "test._1_24_x_windows-latest" failed
test (1.25.x, ubuntu-latest)
The operation was canceled.
test (1.24.x, ubuntu-latest)
The strategy configuration was canceled because "test._1_24_x_windows-latest" failed
test (1.24.x, ubuntu-latest)
The operation was canceled.