The Wayback Machine - https://web.archive.org/web/20110613091943/http://www.neimagazine.com/story.asp?sectionCode=132&storyCode=2057673
Nuclear Engineering International  


 

 
News
 
Modernization works begin at Russia�s oldest VVER-1000
30 September 2010

Unit 5 of Russia�s Novovoronezh NPP has been shut down for 260 days so that modernization works can be carried out to extend its operating life for an additional 30 years.

Novovoronezh 5, which stated up in 1979, is Russia�s oldest VVER-1000 reactor and the first of that type to undergo such an operating life extension. The unit shut on 25 September 2010, after its operating licence expired.

Works will include: modernization of reactor management and protection systems, emergency reactor core cooling and emergency power supply, active components of security systems and radiation safety systems. Supplemental security, standard operation, and equipment diagnositc systems will also be installed.

Preparation works for the operating life extension were started in 2003. During 2003-2010, various studies were carried out including an evaluation of security, feasibility surveys, and studies on the remaining equipment life. These were put together in a report: �Program on preparation of NV NPP power unit No. 5 operating life extension�. That report, together with an in-depth safety assessment confirms the safety of the extended power operation.



Related Articles
Novovoronezh 3 begins PLEX
New life of Novovoronezh 3

 
Buyer's Guide

Search 100's of products or companies


Browse by category A to Z

Site Search

Site and archive search