Cement Bond Logging
Sonically measure the bond between casing and cement including slim and HPHT wells
Measure the bond between casing and cement using the industry standard.
Efficiently decommission your well—with integrity
It’s inevitable. Eventually every well, offshore or onshore, will have to be decommissioned. And you don’t always know from the start whether the plug and abandonment (P&A) will be a straightforward exercise or a complex, capex-intensive operation to achieve compliance with guidelines and regulatory requirements. Complicating the situation—especially in older wells—is that critical data is usually lacking. Advance knowledge of whether rigless P&A could be conducted would significantly drive cost reduction and cost predictability.
Minimizing P&A operational time and spend begins with barrier evaluation. Our proven suite of scalable Epilogue technologies and services enable evaluation and assessment of well integrity to identify rigless opportunities —paving the way for sealing each well with confidence and cost control.
Over many decades, we've established a global presence for our extensive technology portfolio with well engineering and integrated digital capabilities while also constructing an open partnership network.
Confidently seal the well with advanced cementing and resin-based solutions that maintain a permanent, leak-free barrier, even if the stress regime changes or fluid contact occurs.
Thoroughly assess cement and casing without necessarily removing the inner pipe to economically guide P&A.
Definitively determine well integrity in a single run without removing inner pipe
Evaluate the A- and B-annulus in a single run for reduced costs in P&A well decommissioning operations.
Sonically measure the bond between casing and cement including slim and HPHT wells
Measure the bond between casing and cement using the industry standard.
Noninvasively evaluate casing integrity without having to pull completion tubing
Identify and quantify damage and corrosion in single and double strings without pulling completion tubing.
Confirm zonal isolation, centralization, and cement bond quality in real time
Fully characterize well integrity around the entire casing circumference and across the annular environment.
Accurately detect defects in downhole tubulars, completion components, and casings
Identify and visualize corrosion and pipe defects by measuring the well’s inner radii.
Deploy dependable well barrier and isolation solutions on slickline with simplicity and cost-effectiveness.
Precisely install barriers by placing retrievable and permanent plugs with real-time control and data
Efficiently riglessly deploy digital slickline with real-time control or complement rig-based operations.
Identify and remedy damaged tubulars and reliably manage isolation with plugs
Lower rig deployment to save costs and time by managing plugging tasks with slickline mechanical intervention.
Isolate the wellbore by sealing with a permanent, leak-free barrier that meets compliance obligations.
Cleanly sever tubulars to recover casing, drillpipe, coiled tubing, and tubing, including freeing stuck pipe.
Precisely target explosive charges to effectively rupture and split heavyweight pipe and collars for recovery
Cleanly and smoothly cut tubulars in in any fluid environment without the time and cost of cleanout shots.
Efficiently cut up to 8 slots simultaneously and 200 slots in a single run with a highly combinable tool
Avoid explosives and enable new opportunities through production slot recovery within P&A activities.
Execute tubing cutting and punching and pipe recovery on digital slickline for precise control and certainty
Efficiently deploy digital slickline riglessly with real-time control or complement rig-based operations.
Automate tubing cutting for depth-accurate mechanical cuts in the most complex completion profiles
Skip the explosives and automate accurate mechanical tubing cutting, even in the most complex completions.
Quickly resolve challenges with powered intervention on wireline or mechanical intervention on coiled tubing.
Our most advanced suite of services for efficiently removing tubulars, shear, seal, and cement while using comprehensive riserless open-water abandonment.
Optimize decommissioning with integrated capabilities and technologies of SLB and Helix Energy Solutions Group
Boost P&A efficiency and lower cost with innovative riser-based or riserless access to any subsea well.
Remove production tubing in open water with secure intervention riser system or subsea intervention lubricator
Secure gas and contaminants with environmentally compliant open-water removal of production tubing.
Scalable Epilogue evaluation solutions assess the B-annulus cement barrier without inner-pipe removal.
Learn more